Most project cost overruns are not due to construction-site problems. However, the concerns do not start on the paper, but before the first hammer falls, when they choose to ignore a certain number of “little things” that must be taken care of. The incorrect door vs. cabinet swing. The lack of coordination between a structural member and ductwork. It’s the little things that turn into change orders that turn into delays, and the little things that are avoided by solid design and planning.
Architectural design solutions start well before any drawing gets produced. Phase 1 starts with the site review and the site and initial review, including zoning setbacks, FAR limitations, soil type, orientation and what the client really needs. There can be as much as 1/3 of the site available for development that is taken up by setbacks and easements. From the beginning, it is important to know that.
The process will then take the concept design to schematic layout, design development and eventually back to construction documents from here. It rules out options and gives more information for each step. It generally takes 4-8 weeks to get a project into construction documents, and much longer for larger projects. There are few things more frustrating than rushing in the beginning that wind up being time wasted at the end, because structural and services engineers need a solid layout to size beams and ductwork.
Designing residential buildings is best achieved when starting with a consideration of daily activities instead of numbers of rooms. What do the family leave behind in their shoes and bags? In the kitchen which wall is facing the sun in the morning? For example, a house with 10 marlas of land is located in a congested area; to give each room access to daylight and ventilation, the location of the courtyard or light well must be carefully determined.
One of the other big factors is circulation. Long corridors result in wasted space in houses with the staircase set up in the incorrect position, splitting the ground floor. Designers visit the house to check for possible issues, such as carrying groceries from the car park to the kitchen and going to bed at night and getting to the bathroom.
Commercial space planning has less room for guesswork because the building has to satisfy fire codes, accessibility standards, and operational needs at once. For a restaurant, a good kitchen layout should be planned with food flow in mind from receipt to preparation to cooking to serving. For an office, there needs to be sufficient width of egress as well as sightlines to exit stairwells according to occupant loads. Get these wrong and your design will be sent back by the AHJ repeatedly.
Fit-out designs add yet another level of complexity. Columns, shafts, and limited slab loading dictate what is feasible, so it is important to survey the shell space prior to partitioning plans. Retail space with 6-meter column spacing versus 9-meter column spacing would permit entirely different shelving and display arrangements. The leasing department is interested in the number of desks or tables, so that the rent per square foot can be justified.
Flashy renders get attention, but 2D architectural drawings are what contractors actually build from. The floor plan, section, elevation, door and window schedule and wall detail have all the dimensions and specifications. A lack of specification regarding a waterproofing membrane at the threshold of a bathroom can cause water to leak from the ceiling below a year later. Good drawings have good layering standards, good line weight standards, and a proper sheet index since there will be no need to search for information.
There is coordination happening here as well. The structural, electrical, and plumbing drawings are overlaid over the architectural drawings to catch any conflict before the concrete work starts. This is done with ease by software such as AutoCAD and Revit. For instance, Revit has clash detection software that can detect a pipe passing through a beam in seconds. It will take ten minutes to fix the problem using Revit.
3D design visualization gives clients something plans rarely do: a clear picture. People find it hard to read floor plans and approve layouts they cannot really understand. Later on, when the walls go up, they discover that their living room looks narrower than they had anticipated. With a walkthrough or a render created in SketchUp, Lumion, or V-Ray, this problem becomes apparent in the beginning, before one needs to move the wall in the real world.
Images also help you get your approvals quicker. You could compare different materials – such as timber cladding in contrast with fair-faced concrete, or LED with daylight color temperature – within hours using visual aids. People tend to react quicker to images than drawings. The good news is that your model could also be used later for marketing, thus saving you from spending twice on the process.
There is one commonality that the successful projects that stay on budget tend to share: They spend more time on design coordination than planned by the client and less time arguing on-site. A simple test to do prior to any construction is to ask an outside observer to study the drawings and see how long it would take for him to construct one room out of them. This ten-minute task has exposed more costly problems than any software has.